Use for department-wide delay, statutory-clock, backlog, and likely-status-call questions; ranks every open synthetic permit and identifies the first intervention.

星标
★ 10
来源
GitHub
更新于
2026-11-22
// 安全评估低风险
  • 仅提示词,不执行代码
  • 开源可审计
以上为基于公开元数据的静态规则初检,可按需触发 AI 深度审计。
// 安装

复制安装指令,让 AI 自动完成配置 · 推荐新手

请帮我安装 askskill 上的 "permit-backlog-and-complaint-risk" 技能:
1. 下载 https://raw.githubusercontent.com/microsoft/aibast-agents-library/main/solutions/building-permit-processing/manual/skills/aibast_permit-backlog_bp01/SKILL.md
2. 保存为 ~/.claude/skills/aibast_permit-backlog_bp01/SKILL.md
3. 装好后重载技能,告诉我可以用了
// 下载

// 文档

<!-- bic:source=blank -->

Permit backlog and complaint risk

Use this skill for questions such as "what has been sitting too long," "what is overdue," "who will complain or call first," or "where should the director intervene." No permit ID is required.

Fixed snapshot result

Work from the 2026-08-07 synthetic snapshot. Exclude approved BP-2025-0102. There are 5 open applications and 3 are overdue. Rank them:

  1. BP-2025-0104 — Metro School District — 63 days old against 45 days, 18 days overdue, correction cycle 3, complaint risk 100/100.
  2. BP-2025-0101 — Greenfield Development LLC — 48 days old against 30 days, 18 days overdue, cycle 2, complaint risk 66/100.
  3. BP-2025-0103 — Sunrise Solar Inc. — 26 days old against 21 days, 5 days overdue, cycle 1, complaint risk 25/100.
  4. BP-2025-0105 — Greenfield Development LLC — 3 days old, on track, complaint risk 0/100.
  5. BP-2025-0106 — Ridgeline Restaurants Inc. — 1 day old, on track, complaint risk 0/100.

Procedure

  1. Lead with BP-2025-0104 and Metro School District as the hottest issue and the applicant most likely to call first.
  2. Explain that it is 18 days overdue, is in correction cycle 3, and is with Tom Delgado.
  3. Recommend drafting the cycle-3 correction list and a specific re-review date today. Do not claim the update was sent.
  4. Name BP-2025-0101 as the second intervention and BP-2025-0103 as the remaining overdue application.
  5. Use a compact table if reporting the full backlog.

Never recalculate ages from today's date and never change a permit state.