BuildWindow

Schedule construction tasks around forecasts, curing times, and dependency windows.

Source
third_party_registry
Updated
2026-09-20
// securityCaution
  • Runs locally
  • Open source
Static rule checks from public metadata; run an AI deep audit on demand.
// install

Copy the install command and let the AI configure it · recommended for beginners

No copy-paste install info for "BuildWindow" yet — see the docs or source repo.

// examples

Schedule a concrete pour
Prompt
Using the next 7 days of weather forecasts, identify suitable time windows for a concrete pour and estimate the curing time needed before the next task.
Expected

A list of workable time windows, weather suitability decisions, and the estimated start time for the dependent task.

Schedule dependent construction tasks
Prompt
I have three dependent tasks: surface preparation, coating application, and curing. Use weather constraints to place them into the earliest non-prohibited time windows.
Expected

A dependency-aware schedule showing the earliest feasible slot for each task and why each slot was selected.

Check whether weather allows work to start
Prompt
Determine whether the weather over the next two days is suitable for outdoor construction and mark any prohibited time periods.
Expected

A clear list of suitable and unsuitable work periods to support a go/no-go decision.

// use cases

Incorporate weather constraints into construction scheduling

When construction work is affected by rain, temperature, or other forecast conditions, this tool can evaluate which time windows are suitable. It helps users avoid placing tasks into prohibited periods.

Plan follow-up tasks that depend on curing time

For tasks that require materials to cure before the next step, it can estimate the required waiting time and schedule follow-on work accordingly. This helps find the earliest feasible downstream window.

Handle construction tasks with dependencies

When several construction steps must happen in sequence, the tool can consider both dependencies and weather suitability together. Users can build a more executable work schedule from that result.

// docs

No documentation provided

Check the source repo for usage and examples.

Go to source repo ↗

// FAQ

What does BuildWindow do?

It is used to schedule construction work against weather forecasts. Based on the description, it checks weather suitability, estimates curing times, and places dependent tasks into the earliest feasible non-prohibited windows.

What inputs does it need?

From the description, it at least needs weather forecasts, the construction tasks, and dependency relationships between them. If curing is involved, it also needs the relevant timing requirements for that step.

How is it different from a generic scheduling tool?

It does more than fill calendar gaps; it specifically considers weather suitability, curing time, and task dependencies. The description also notes that it uses deterministic tools for these decisions.